A construction line of credit charges interest on each draw for the days it is out. This worksheet works that arithmetic by hand, step by step, with invented figures: draw interest, an unused-line fee, a term-out payment and an equipment payment, so an Asheboro, NC contractor can price an offer before signing.

In short

A worked-by-hand construction line of credit worksheet from Groveleaf Capital in Asheboro, North Carolina: daily interest on draws, unused-line fees, terming out a balance and equipment payments, all with invented figures.

The Inputs a Construction Line of Credit Worksheet Uses

  • The annual interest rate on the offer, and whether it is fixed or tied to an index.
  • The amount of each draw and the date it is taken.
  • The date each draw is paid back, usually when the job's draw arrives.
  • Any fee on the unused part of the limit.
  • Draw fees, annual fees and the review date.

Every number in the examples below is invented. Replace them with the figures on an actual offer.

Daily Interest on One Draw: The Formula for Randolph County, NC Contractors

Interest on a draw = amount x annual rate x days outstanding / 365. Some offers divide by 360 instead, which raises the interest slightly; check which the offer uses.

Illustration only, invented figures: an invented $38,000 draw at an invented 11.5% for 42 days costs $503 (our arithmetic).

A Four-Draw House Schedule Worked by Hand in Asheboro, NC

Invented draw schedule at an invented 11.5% annual rate
DrawWhat it pays forAmountDays outInterest
Draw 1Foundation and framing lumber$38,00042$503
Draw 2Roofing, windows and doors$27,00035$298
Draw 3Mechanical rough-ins$31,00030$293
Draw 4Drywall and finishes$24,00028$212
Total$120,000$1,305

Illustration only, invented figures: four invented draws over one house cost $1,305 in interest in all (our arithmetic). If the builder's draws arrive late, every row's days grow and the interest with them.

Commercial Line of Credit Calculator: The Unused-Line Fee

Some lines charge a fee on the part of the limit not in use. Illustration only, invented figures: on an invented $150,000 limit over the invented 135-day schedule above, the average balance drawn works out to about $30,689; a 0.25% annual fee on the unused average of about $119,311 costs about $110 for the period (our arithmetic).

Small, but worth adding to the total before comparing offers.

Terming Out a Balance: A Construction Business Loan Calculator Step

When a job ends with part of the line still drawn, some partners allow the balance to be converted to a term loan. Illustration only, invented figures: an invented $60,000 termed out over 36 months at an invented 10.0% gives a payment of about $1,936 a month (our arithmetic), using the standard payment formula: payment = balance x r / (1 - (1 + r)^-n), where r is the monthly rate and n the number of months.

Construction Equipment Financing Calculator for Randolph County, NC Contractors: Skid Steers

The same formula prices a machine. Illustration only, invented figures: an invented $64,000 skid steer with 10% down leaves $57,600 to finance; over 48 months at an invented 9.0% the payment is about $1,433 a month (our arithmetic). Equipment financing explains loans and leases.

Comparing a Line With Working Capital for the Same Job in Asheboro, NC

A working capital loan pays interest on the full amount for its whole term. A line pays only on what is drawn for as long as it is drawn. For a job with four draws spread over months, the line's interest in the worksheet above is far smaller than a lump sum held for the same period, but lines carry review dates and fees that a fixed loan does not. Compare the totals.

Approval, Limits and Late Builder Draws: What These Hand Calculations Leave Out

It cannot tell you whether a partner will approve the line, what limit it sets, or whether the rate will change. It also ignores the cost of a builder paying late, which shows up as more days on every row. For the full picture of lines, see business lines of credit; for crews and trades, see construction business loans.

Interest Rate Changes on a Variable Construction Line

If the rate is tied to an index, each draw's interest depends on the rate in force while it is out. Illustration only, invented figures: had the invented rate above been one point higher for the whole schedule, the four invented draws would cost about $1,419 instead of $1,305 (our arithmetic). Run the worksheet at a higher rate as a check on how much room the job has.

Checklist Before Signing a Construction Line Offer in Randolph County, NC

  1. Write down the rate, the day count (365 or 360) and how the rate can change.
  2. List every fee: origination, draw, unused, annual.
  3. Note the review date and any clean-up period at zero balance.
  4. Run your own draw schedule through the formula above.
  5. Compare the total with a working capital or term loan offer for the same job.

By Groveleaf Capital · Updated

Pages Linked to Credit Line Worksheet

  • The resource page

    Guides for Asheboro, NC owners: zoning and building permits, the NC food establishment permit, and a construction line of credit worksheet.

  • Zoning and Permits

    Asheboro, NC zoning map and building permits: checking zoning at an address, the permit portal, inspections, new sites…

  • NC Food Permit

    NC food establishment permit for Asheboro, NC: Randolph County plan review, permits, temporary events, mobile food…

The Essentials of Credit Line Worksheet Around Asheboro, NC

Brief answers to first questions about sending a request.

Phone (336) 518-0165
Is this a live calculator?

No. It is a worksheet worked by hand with invented figures; use the formulas with the numbers on your own offer.

Why do some offers divide by 360?

It is a convention some funders use; dividing by 360 instead of 365 makes each day's interest slightly higher.

Will the worksheet match an offer?

Only if you use the offer's own rate, fees and day count, and even then the partner's statement governs.

Plain Guides on Credit Line Worksheet Near Asheboro, NC

  • Zoning and Permits

    Asheboro, NC zoning map and building permits: checking zoning at an address, the permit portal, inspections, new sites and county permits.

  • NC Food Permit

    NC food establishment permit for Asheboro, NC: Randolph County plan review, permits, temporary events, mobile food units and grades.

Holding a Construction Line Offer? Price the Draws First

Phone (336) 518-0165 with the offer and your draw schedule, or use the web form.

Phone (336) 518-0165RequestDirections